Showing posts with label Structural Engineering. Show all posts
Showing posts with label Structural Engineering. Show all posts

Monday, March 12, 2018

2017 PCMA Best of Precast Concrete Awards

I like to check Linkedin on regular basis. Walter P Moore had an intresting content when I was looking through my home page. Before I read the title, I saw the picture attached, which was a picture of Kyle Field. In case you didn't know, it is located in College Station. Let me add the description here.
https://www.linkedin.com/feed/update/urn:li:activity:6374318535962873856/

Ofcourse, it is a big honor to receive such a price for the stadium I would see on daily basis. Another intresting point was, the precast designer team, Consulting Engineers Group was a company I worked for through my old employer. And another exciting point was, the Professional Engineer who worked on the project was supervising one of the projects I worked on, and  had chance to work with him.

Once again I congratulate anyone who got involved in this great project!  Let me share my picture in this amazing stadium once again and here is a youtube video


Saturday, March 3, 2018

Designing 14 Story Precast Parking Garage


When I started in Feb 2017, I had some general knowledge from school and a bag full of dreams. Eventually it was worth going through the hard work. Even though because of external reasons I have to leave the company before the project was completed, I probably made great friends there.

I like being challenged and eventually become competitive in whatever I am doing. At my very first industry job, I got involved in a 14 story parking garage project. I was responsible for coordination, partial structural calculations and manufacturing ticket control.

I recently received a message from one of my co-workers about a link that directly takes me to the camera which is monitoring the construction 24/7 and daily photos are added. I am sharing the link here if you’d like to take a look at it.

Here are 5 things I learned from this project;

1. Precast

It was my first project working with precast concrete. I was involved in structural design, structural calculations, drawing coordination and ticket controlling and external communication phases.

2. Tall structure design

Most of the assumptions for low-rise and mid-rise structures cannot be used for a 14 story structure.

3. Internal and external communication

If you ask me what is most important factor for successful project, I would say it is communication. If you do not have solid proof of information you passed forward, you’ll end up being blamed. Timings on projects fail due to miscommunication.

4. Importance of codes

You have to use specific codes for every single line of calculation. My gain from this was learning to use PCI design and connection manual.

5. The confidence

After designing 14 story parking garage, I will never be afraid of any tall structure. Even though I couldn’t find a solid information, number of parking garages such high are very limited.